Welcome to your C-10 Electrical - Practice Exam 2
1.
What is the maximum ampere rating for a receptacle installed on a 20-ampere branch circuit?
What is the maximum ampere rating for a receptacle installed on a 20-ampere branch circuit?Deselect Answer
2.
When calculating the service size for a new home, which loads are included in the calculation?
When calculating the service size for a new home, which loads are included in the calculation?Deselect Answer
3.
What must a contractor do when an employee is injured on a job site in California?
What must a contractor do when an employee is injured on a job site in California?Deselect Answer
4.
After replacing a circuit breaker, how should its operation be verified?
After replacing a circuit breaker, how should its operation be verified?Deselect Answer
5.
What is the minimum arc flash PPE category required for work on energized 480-volt switchgear with the door open?
What is the minimum arc flash PPE category required for work on energized 480-volt switchgear with the door open?Deselect Answer
6.
What is the purpose of an expansion fitting in a PVC conduit installation?
What is the purpose of an expansion fitting in a PVC conduit installation?Deselect Answer
7.
During startup testing, a circuit breaker feels warm to the touch after being energized for 30 minutes. What should be done?
During startup testing, a circuit breaker feels warm to the touch after being energized for 30 minutes. What should be done?Deselect Answer
8.
A new circuit tests as dead at the outlet but the breaker is not tripped. What is the most likely cause?
A new circuit tests as dead at the outlet but the breaker is not tripped. What is the most likely cause?Deselect Answer
9.
What is the proper installation method for a dishwasher electrical connection?
What is the proper installation method for a dishwasher electrical connection?Deselect Answer
10.
What is the maximum weight a standard outlet box can support for a ceiling-mounted luminaire?
What is the maximum weight a standard outlet box can support for a ceiling-mounted luminaire?Deselect Answer
11.
What is the purpose of a conduit body (LB, LL, LR, T fitting) in a conduit system?
What is the purpose of a conduit body (LB, LL, LR, T fitting) in a conduit system?Deselect Answer
12.
What warning sign must be posted on electrical rooms and equipment rooms containing exposed energized conductors?
What warning sign must be posted on electrical rooms and equipment rooms containing exposed energized conductors?Deselect Answer
13.
A 3-phase motor draws significantly higher current on one phase than the other two. What is the most likely cause?
A 3-phase motor draws significantly higher current on one phase than the other two. What is the most likely cause?Deselect Answer
14.
What is the minimum working clearance required for a 480-volt panel with live parts on one side?
What is the minimum working clearance required for a 480-volt panel with live parts on one side?Deselect Answer
15.
When installing a three-way switch, which terminal is the common terminal?
When installing a three-way switch, which terminal is the common terminal?Deselect Answer
16.
What is the correct way to install a GFCI receptacle to protect downstream outlets on the same circuit?
What is the correct way to install a GFCI receptacle to protect downstream outlets on the same circuit?Deselect Answer
17.
What first aid action is the highest priority for an electrical shock victim who is unresponsive and not breathing?
What first aid action is the highest priority for an electrical shock victim who is unresponsive and not breathing?Deselect Answer
18.
When labeling circuits in a residential panel at finish, what information must be included?
When labeling circuits in a residential panel at finish, what information must be included?Deselect Answer
19.
What type of raceway system is required in a Class I, Division 1 hazardous location?
What type of raceway system is required in a Class I, Division 1 hazardous location?Deselect Answer
20.
What is the required frequency of electrical safety training for workers exposed to electrical hazards per NFPA 70E?
What is the required frequency of electrical safety training for workers exposed to electrical hazards per NFPA 70E?Deselect Answer
21.
A new subpanel installation shows voltage between the neutral bar and the enclosure. What is the likely cause?
A new subpanel installation shows voltage between the neutral bar and the enclosure. What is the likely cause?Deselect Answer
22.
What is the ampacity of a 10 AWG copper conductor with 75-degree C insulation in a dry location?
What is the ampacity of a 10 AWG copper conductor with 75-degree C insulation in a dry location?Deselect Answer
23.
When trimming out a 3-phase panelboard, what must be verified before energizing the main breaker?
When trimming out a 3-phase panelboard, what must be verified before energizing the main breaker?Deselect Answer
24.
What type of enclosure is required for electrical equipment installed in a wet location?
What type of enclosure is required for electrical equipment installed in a wet location?Deselect Answer
25.
When estimating labor for conduit installation, which factor most significantly affects productivity?
When estimating labor for conduit installation, which factor most significantly affects productivity?Deselect Answer
26.
A 240-volt single-phase load draws 15 amperes continuously. What minimum circuit breaker size is required?
A 240-volt single-phase load draws 15 amperes continuously. What minimum circuit breaker size is required?Deselect Answer
27.
What is the maximum number of disconnects permitted to serve as the service disconnecting means for a single building?
What is the maximum number of disconnects permitted to serve as the service disconnecting means for a single building?Deselect Answer
28.
What Cal/OSHA regulation covers electrical safety for general industry workers in California?
What Cal/OSHA regulation covers electrical safety for general industry workers in California?Deselect Answer
29.
What is required when splicing conductors larger than 4 AWG in a junction box?
What is required when splicing conductors larger than 4 AWG in a junction box?Deselect Answer
30.
A PV system produces 8 kilowatts at 240 volts. What is the approximate full-load current output?
A PV system produces 8 kilowatts at 240 volts. What is the approximate full-load current output?Deselect Answer
31.
After installing a new generator with an automatic transfer switch, how should the system be tested?
After installing a new generator with an automatic transfer switch, how should the system be tested?Deselect Answer
32.
What is required when installing a range hood that recirculates air rather than venting to the exterior?
What is required when installing a range hood that recirculates air rather than venting to the exterior?Deselect Answer
33.
A fluorescent light fixture flickers and has a burned smell. What should be done first?
A fluorescent light fixture flickers and has a burned smell. What should be done first?Deselect Answer
34.
When installing conduit through wood framing members, what protection is required for conductors?
When installing conduit through wood framing members, what protection is required for conductors?Deselect Answer
35.
What is the purpose of a one-line diagram in electrical planning?
What is the purpose of a one-line diagram in electrical planning?Deselect Answer
36.
When is a disconnecting means required to be within sight of HVAC equipment?
When is a disconnecting means required to be within sight of HVAC equipment?Deselect Answer
37.
What is the maximum overcurrent protection permitted for a 12 AWG copper branch circuit conductor?
What is the maximum overcurrent protection permitted for a 12 AWG copper branch circuit conductor?Deselect Answer
38.
When commissioning a PV battery storage system, what must be verified regarding the state of charge?
When commissioning a PV battery storage system, what must be verified regarding the state of charge?Deselect Answer
39.
What is the maximum distance from a panelboard that EMT must be supported?
What is the maximum distance from a panelboard that EMT must be supported?Deselect Answer
40.
What is the purpose of short circuit current rating (SCCR) on electrical equipment?
What is the purpose of short circuit current rating (SCCR) on electrical equipment?Deselect Answer
41.
When using nonmetallic sheathed cable (NM-B) in an attic accessible by a permanent ladder, how must the cable be protected?
When using nonmetallic sheathed cable (NM-B) in an attic accessible by a permanent ladder, how must the cable be protected?Deselect Answer
42.
What is the minimum insulation resistance required for a conductor to be considered safe for energizing per IEEE standards?
What is the minimum insulation resistance required for a conductor to be considered safe for energizing per IEEE standards?Deselect Answer
43.
What does Cal/OSHA require regarding the use of damaged or defective hand tools on a job site?
What does Cal/OSHA require regarding the use of damaged or defective hand tools on a job site?Deselect Answer
44.
What NEC article governs the installation of underground feeder cable (Type UF)?
What NEC article governs the installation of underground feeder cable (Type UF)?Deselect Answer
45.
After installing a new 3-phase motor, it runs but rotates in the wrong direction. What is the simplest correction?
After installing a new 3-phase motor, it runs but rotates in the wrong direction. What is the simplest correction?Deselect Answer
46.
In a battery energy storage system (BESS), what does the C-rate indicate?
In a battery energy storage system (BESS), what does the C-rate indicate?Deselect Answer
47.
What is the purpose of an electrical load schedule on commercial plans?
What is the purpose of an electrical load schedule on commercial plans?Deselect Answer
48.
What does a high megohmmeter reading (above 100 megohms) on a motor winding indicate?
What does a high megohmmeter reading (above 100 megohms) on a motor winding indicate?Deselect Answer
49.
When is a surge protective device (SPD) required by the NEC for a dwelling unit service?
When is a surge protective device (SPD) required by the NEC for a dwelling unit service?Deselect Answer
50.
When sizing conductors for a feeder supplying multiple branch circuits, what percentage of continuous loads must be added?
When sizing conductors for a feeder supplying multiple branch circuits, what percentage of continuous loads must be added?Deselect Answer
51.
What is the purpose of a weatherproof in-use cover on an outdoor receptacle?
What is the purpose of a weatherproof in-use cover on an outdoor receptacle?Deselect Answer
52.
When using a portable electric drill on a construction site, what safety feature is required by Cal/OSHA?
When using a portable electric drill on a construction site, what safety feature is required by Cal/OSHA?Deselect Answer
53.
What factor must be applied when four or more current-carrying conductors are installed in a conduit?
What factor must be applied when four or more current-carrying conductors are installed in a conduit?Deselect Answer
54.
What does kVA stand for and how does it relate to kW?
55.
What voltage reading between hot and neutral at a receptacle indicates a high-resistance neutral connection?
What voltage reading between hot and neutral at a receptacle indicates a high-resistance neutral connection?Deselect Answer
56.
What is the minimum clearance required between service entrance conductors and windows, doors, and walkways?
What is the minimum clearance required between service entrance conductors and windows, doors, and walkways?Deselect Answer
57.
When installing a service entrance, what is the minimum height of the service point above grade at the meter?
When installing a service entrance, what is the minimum height of the service point above grade at the meter?Deselect Answer
58.
What is the correct procedure when a multimeter reads OL (overload) when measuring resistance?
What is the correct procedure when a multimeter reads OL (overload) when measuring resistance?Deselect Answer
59.
When installing tamper-resistant receptacles, what feature prevents insertion of a single object into one slot?
When installing tamper-resistant receptacles, what feature prevents insertion of a single object into one slot?Deselect Answer
60.
What is the purpose of a panelboard schedule on electrical drawings?
What is the purpose of a panelboard schedule on electrical drawings?Deselect Answer
61.
What is the purpose of a ground fault circuit interrupter (GFCI) in terms of the current level it detects?
What is the purpose of a ground fault circuit interrupter (GFCI) in terms of the current level it detects?Deselect Answer
62.
What is the primary purpose of arc flash labeling on electrical equipment?
What is the primary purpose of arc flash labeling on electrical equipment?Deselect Answer
63.
What is the maximum height above the floor for a standard wall receptacle installation?
What is the maximum height above the floor for a standard wall receptacle installation?Deselect Answer
64.
What information must be included on a permit application for a new residential electrical service?
What information must be included on a permit application for a new residential electrical service?Deselect Answer
65.
When installing a 240-volt baseboard heater, what type of thermostat must be used?
When installing a 240-volt baseboard heater, what type of thermostat must be used?Deselect Answer
66.
What is the minimum cover required for Schedule 80 PVC conduit installed under a public street?
What is the minimum cover required for Schedule 80 PVC conduit installed under a public street?Deselect Answer
67.
What is the purpose of a job hazard analysis (JHA) before beginning electrical work?
What is the purpose of a job hazard analysis (JHA) before beginning electrical work?Deselect Answer
68.
What is the minimum conductor size for a 20-ampere branch circuit supplying receptacles in a commercial occupancy?
What is the minimum conductor size for a 20-ampere branch circuit supplying receptacles in a commercial occupancy?Deselect Answer
69.
What NEC article covers branch circuit requirements for dwelling units?
What NEC article covers branch circuit requirements for dwelling units?Deselect Answer
70.
During commissioning, a new lighting circuit's AFCI breaker trips when an LED driver is connected. What is the likely cause?
During commissioning, a new lighting circuit's AFCI breaker trips when an LED driver is connected. What is the likely cause?Deselect Answer
71.
What is the minimum number of small appliance branch circuits required in a residential kitchen?
What is the minimum number of small appliance branch circuits required in a residential kitchen?Deselect Answer
72.
What NEC section requires a laundry branch circuit in a residential dwelling?
What NEC section requires a laundry branch circuit in a residential dwelling?Deselect Answer
73.
When pulling wire through conduit, what is the maximum recommended pulling tension for copper conductors?
When pulling wire through conduit, what is the maximum recommended pulling tension for copper conductors?Deselect Answer
74.
What color is used to identify a phase B conductor in a 3-phase system using the standard color code?
What color is used to identify a phase B conductor in a 3-phase system using the standard color code?Deselect Answer
75.
What type of electrical plan drawing shows the routing of conduit and cable through a building structure?
What type of electrical plan drawing shows the routing of conduit and cable through a building structure?Deselect Answer
76.
What is required when installing a bathroom exhaust fan with a heating element on a branch circuit?
What is required when installing a bathroom exhaust fan with a heating element on a branch circuit?Deselect Answer
77.
Which of the following correctly describes an equipment grounding conductor (EGC)?
Which of the following correctly describes an equipment grounding conductor (EGC)?Deselect Answer
78.
A wind generator is rated at 10 kW at 48 VDC. What is the rated output current?
A wind generator is rated at 10 kW at 48 VDC. What is the rated output current?Deselect Answer
79.
What does the term 'qualified person' mean in the context of electrical safety?
What does the term 'qualified person' mean in the context of electrical safety?Deselect Answer
80.
What is the purpose of a hipot (high potential) test on new cable installations?
What is the purpose of a hipot (high potential) test on new cable installations?Deselect Answer
81.
What is the recommended maintenance interval for inspecting and retorquing electrical connections in industrial panels?
What is the recommended maintenance interval for inspecting and retorquing electrical connections in industrial panels?Deselect Answer
82.
Which instrument is used to measure the resistance of a grounding electrode system?
Which instrument is used to measure the resistance of a grounding electrode system?Deselect Answer
83.
What is the maximum size hole that may be drilled in a 2x4 wood stud for conduit or cable passage?
What is the maximum size hole that may be drilled in a 2x4 wood stud for conduit or cable passage?Deselect Answer
84.
What is the minimum bending radius for a 1-inch EMT conduit?
What is the minimum bending radius for a 1-inch EMT conduit?Deselect Answer
85.
What is the maximum distance allowed between receptacles along a wall in a residential living room?
What is the maximum distance allowed between receptacles along a wall in a residential living room?Deselect Answer
86.
What is the minimum dedicated bathroom branch circuit requirement per the NEC?
What is the minimum dedicated bathroom branch circuit requirement per the NEC?Deselect Answer
87.
What is required at each end of a conduit run that terminates in a wet location enclosure?
What is required at each end of a conduit run that terminates in a wet location enclosure?Deselect Answer
88.
What is the required response when an electrical worker discovers an unlabeled energized conductor during a remodel?
What is the required response when an electrical worker discovers an unlabeled energized conductor during a remodel?Deselect Answer
89.
When more than one neutral conductor is present in a panel, how must they be terminated?
When more than one neutral conductor is present in a panel, how must they be terminated?Deselect Answer
90.
What is required when an electrical contractor discovers asbestos-containing pipe insulation in a ceiling space during rough wiring?
What is required when an electrical contractor discovers asbestos-containing pipe insulation in a ceiling space during rough wiring?Deselect Answer
91.
What does a reading of infinite resistance (OL) between a motor winding and ground indicate?
What does a reading of infinite resistance (OL) between a motor winding and ground indicate?Deselect Answer
92.
What is the minimum size aluminum conductor permitted for a 200-ampere residential service entrance?
What is the minimum size aluminum conductor permitted for a 200-ampere residential service entrance?Deselect Answer
93.
What is the Cal/OSHA requirement for electrical workers working alone on energized equipment?
What is the Cal/OSHA requirement for electrical workers working alone on energized equipment?Deselect Answer
94.
What is the standard demand factor applied to the first 3000 VA of residential general lighting load?
What is the standard demand factor applied to the first 3000 VA of residential general lighting load?Deselect Answer
95.
How must a panelboard be identified when installed in a building?
How must a panelboard be identified when installed in a building?Deselect Answer
96.
What is the purpose of an equipment grounding conductor in terms of worker safety?
What is the purpose of an equipment grounding conductor in terms of worker safety?Deselect Answer
97.
What is the minimum approach distance for a qualified worker to an exposed energized conductor at 480 volts?
What is the minimum approach distance for a qualified worker to an exposed energized conductor at 480 volts?Deselect Answer
98.
When installing a 3-phase panelboard, how must the panel be oriented to maintain proper phase sequence?
When installing a 3-phase panelboard, how must the panel be oriented to maintain proper phase sequence?Deselect Answer
99.
What is required when Type NM cable is run exposed on the surface of finished walls in a garage?
What is required when Type NM cable is run exposed on the surface of finished walls in a garage?Deselect Answer
100.
When planning a generator installation, what device is required to prevent backfeed to the utility?
When planning a generator installation, what device is required to prevent backfeed to the utility?Deselect Answer
101.
What does the term 'short circuit' mean in electrical work?